During the period between June 27 - June 29, various servers will be scheduled for network upgrades. All upgrades will occur after 12 AM EDT (-0400 GMT) and should result in less than 30 minute outage for each component scheduled.
Upgrades include improved virtualization (SR-IOV) and 10GbE for newer platforms. All remaining connections will be at least 1GbE.
Affected components include:
- Network uplink
- Helios - 1GbE upgrade
- Aleph - 1GbE upgrade
- Apollo - 1 GbE upgrade
- Image - 1 GbE upgrade
- HV1 - 10GbE hardware upgrade
- HV2 - 10GbE hardware upgrade
- Mail filtering - 10GbE hardware upgrade
- Backups - 10GbE hardware upgrade
More details will be posted as windows are dialed in.